Mathematical Solution of Jute Spinning Frame Problems

Mathematical Solution of Jute Spinning Frame Problems
Engr Avijit Dey
Production Officer
Fabian Group, Chittagong
Mobile: 01836124490
E-mail: avijitdey43@yahoo.com



Introduction: 

The three essential tasks of spinning process are

  • Drafting
  • Twisting
  • Winding-on
Drafting is carried out by the usual arrangement of retaining rollers and drawing rollers where drawing rollers rotate faster then retaining rollers.

After emerging out from the nip of drafting rollers the thin ten-uous sliver passes down to the top of the flyer goes through its hollow leg and wound onto the bobbin. During flyer ration it is imparted necessary amount of twist.

Winding on function is carried out by builder mechanism. As the builder moves up and down the bobbins alternatively rise into and withdraw from the flyer and thus winds yarn on the bobbin in a continuous spiral.


Problem 1:
What will be the prodn for 8 hrs working of a spg. From of 100 spyndles with particulars as below:

  • R.P.M of flyer = 3300; 
  • TPI = 3.35
  • Sliver from finisher drawing frame = 0.5lbs/100yds.
  • Spg frame efficiency = 80%
Solution:

                    14400×0.5
Spg count = ……..……… = 8lbs/spyndle.
                      9×100

                        3300×60×8×100×8×0.8
Prodn/ shifts = …………………………… = 583.747 lbs.
(ANS)
                            3.35×36×14400

Problem 2:
Find out the required input sliver in lbs of jute spg mills having 10 Apron draft sliver spinning frame to produce 10 lbs/spindle. Hessian warp yarn (Assume necessary parameters)

Solution:

Here, no of Apron draft sliver spg frame =10

Hessian warp yarn count = 10 lbs/spindle.

Let, Spindle speed =4000 r.p.m, K factor = 12

No of spindle = 100

Wastage = 2%, Efficiency = 90%

TPI =12÷
 √10  = 3.8

Then, prodn/ spg frame/day in lbs

   4000×60×24×10×100×90×10
= ………………………………………
         14400×3.8×36

Then, input sliver in lbs = 26315.78947× {(100+L)÷100}

= 26842.10526 . (ANS)

Problem 3:
Find the prodn /shift of 8 hrs of a jute mill having 28 frames of 100 spindles each running with the following particular

  • Flyer speed=3800 r.p.m
  • T.P.I=3.2
  • Count=8.6 lbs/spindle
  • Eff=84%
Comment on the quality of the yarn produced if 10% root cutting are used in the mixing along with good fibre.

Solution:

                              3800×60×8×8.6×.84×100×28
Production/Shift = …………………………………
                                       3.2×36×14400

= 22240.556 lbs.
(ANS)
 